Valle

Overview

  • 1200Ha of extensive hydrothermal alteration at 4300m elevation, 3-hour drive from Copiapo via international highway and 26km S of 9Moz Au Lobo-Marte project (Kinross).
  • Reconnaissance geology and geochem, 205 rock/soil samples and 52 terraspec samples.

Project Presentation