Alicia

Alicia Map

Overview

  • Phase 1 Drilling Completed Q1 2021 (1500m), Phase 2 scheduled for Q3 2021.
  • High sulfidation epithermal project with 6200Ha at 4300-5000m elevation, 90km E of El Salvador and within 30km SE of Salares Norte.
  • Features a large concession block covering an extensive zone of hydrothermal alterations.
  • Previous work includes geologic mapping, geochem sampling via grid for alteration mapping.

Project Presentation